WATER DAMAGED FLOORS ALL REPAIRED AND ALL FLOORS LIFT LOBBIES REPAINTED

Today, our 3rd. Floor lobby walls have been repainted. We had to brick up the hacked wall to expose the water leakage from the toilet from the 4th. Floor of Block I.

We took the opportunity to paint all lift lobbies from 5th. Floor to our Lower Ground.

5th. floor lift lobby

4th. floor lobby repainted 

3rd floor wall repaired & repainted

2nd. Floor 

1st. Floor done up

Main entrance to ground floor lobby

Main lift lobby repainted 

Lower ground lift lobby painted up

JMB Block J likes to thank our owners and tenants for your patience in getting the repairs and painting works undertaken.