Saturday, April 23, 2016

DRAIN COVER REPAIRED

Today, our in house-contractor repaired the damaged drain cover at the corner of our building.

More reinforced steel bars are placed before concrete is poured onto it.




Concrete was then  poured on top of this reinforced steel structure.


Final job done while waiting for the concrete to set in.




No comments:

Post a Comment